image

RFP-MESA-2023-010_Amendment 02 Activity Title: “Flexibility Assessment of the Moldovan Power System”

02-05-2023

USAID PROCUREMENT INFORMATION BULLETIN PIB NO: RFP-MESA-2023-010_Amendment 02

DATE: April 5, 2023

___________________________________________________ Office of Acquisition Assistance, Washington, D.C. 20523 ___________________________________________________

RFP ISSUANCE DATE:                                               April 5, 2023

SUBMISSION DEADLINE extended:                           May 12, 2023

SUBCONTRACT ISSUANCE DATE:                           O/A May 15, 2023

AUTHORITY:                                                                USAID Contract # 72011722F00002

USAID GEOGRAPHIC CODE:                                      935

COUNTRY:                                                                    Moldova

DESCRIPTION:Request for Proposals No. RFP-MESA-2023-010_Amendment 02 Activity Title: “Flexibility Assessment of the Moldovan Power System”

PURCHASER:                                                                Tetra Tech ES, Inc.

                                                                                         E-mail: MESABIDS@tetratech.com

Tetra Tech is the implementer of the Moldova Energy Security Activity (MESA) which is a 4-year project funded by the United States Agency for International Development. The objective of the Moldova Energy Security Activity (MESA) is to strengthen Moldova’s energy security by: (1) advancing physical and market integration of the Moldovan energy sector with Europe; (2) increasing renewable energy integration; and (3) increasing investment in energy efficiency and domestic power generation, particularly through increased adoption of renewable energy technologies.

The Moldova Energy Security Activity (MESA) is supporting Moldelectrica to enhance its capability to provide and manage electricity balancing and load-frequency control to address the challenges caused by increased renewable energy (RES) penetration in the Moldovan electricity grid and participation in the Ukraine-Moldova Control Block which is planning permanent accession to the Continental Europe Synchronous Area.

Within this context, MESA is seeking technical expertise to analyze the operational, technical, physical allocation and legal/regulatory requirements for the deployment of electricity balancing and load-frequency control capabilities. 

The detailed RFP can be found by following the link:

https://drive.google.com/file/d/1tCsDlP3YHDQ0hW59K9bCIFR014o1BvmP/view?usp=sharing

The Attachments in word format can be accessed here:

https://docs.google.com/document/d/16T3YG93Dyg6ope9w06D7uEeCl9PSDMD2/edit?usp=sharing&ouid=117915501751599698579&rtpof=true&sd=true

All offers must be submitted no later than May 12, 2023 at 14:00 Chisinau Time.

Email subject should reference the RFP number and should include complete contact information.

Articol adaugat de: Olga BircaTetraTech

Alte articole de la acest autor:
  • RFP-MESA-2023-010_Amendment 01 Activity Title: “Flexibility Assessment of the Moldovan Power System”
  • RFP-MESA-2023-009_Amendment 01 Activity Title: “Procurement and Installation Wide Area Management System (WAMS)”
  • Site Supervisor (Part-time) - Moldova Energy Security Activity (MESA)
  • Construction Project Manager (Part-Time) -Moldova Energy Security Activity (MESA)
civic.md
image